PrefabX Modular Changing Rooms

Modular changing rooms built to last the season after season.

Insulated, plumbed and hard wearing changing space for clubs, pitches and facilities, delivered finished and installed in 2 to 3 days. A real building, not a worn out cabin.

4.9/5 from 336 reviews 01743 491181

Prefer to see one first? Book a show home visit

Modular changing rooms are factory built changing and washing facilities installed quickly on site. The PrefabX modular home arrives finished, insulated and plumbed, and is installed in 2 to 3 days, giving sports clubs and facilities durable changing space without a long, costly build.

Modular changing rooms are right for you if

  • Your club or facility needs durable changing and washing space
  • You want a real building, not a tired portable unit
  • You need it ready for the season without a long build
  • You want a fixed price and low ongoing maintenance

Why a PrefabX modular changing rooms works

Hard wearing and secure

A galvanised steel frame and a weatherproof, SGS tested envelope stand up to heavy use and the elements, season after season.

Ready for the season

Built off site and installed in 2 to 3 days, so changing space is ready when fixtures start rather than mid season.

Warm and properly plumbed

Insulated and fitted with heating and plumbing as standard, so it is comfortable to use and quick to bring into service.

The range

The best modular home for changing rooms

The Hub gives one open space to fit out with benches, showers and storage, while the Grand joins two units for separate home and away or male and female facilities.

Gallery

See the modular changing rooms in use.

Photo coming soon

Modular Changing Rooms placeholder

Photo coming soon

Modular Changing Rooms placeholder

Photo coming soon

Modular Changing Rooms placeholder

Steve Robinson
“Our old changing rooms were past it. These went up before the season started, they are warm and hard wearing, and the club finally has facilities to be proud of.”

Steve Robinson

Club Chairman, County Durham

Walkthrough

Take a closer look.

Video walkthrough coming soon

Modular Changing Rooms placeholder

Common questions

Modular Changing Rooms questions, answered.

A PrefabX changing room building is installed in 2 to 3 days once the base is ready, and is manufactured off site beforehand, so it can be in service well before the season starts.

Permanent changing facilities usually need planning permission, while some temporary uses have permitted development rights. We assess your site and use and support the planning process where it is required.

Yes. The modular home uses a hot dip galvanised steel frame and a tested, weatherproof envelope built for a 50 year life, so it withstands the heavy, repeated use a sports facility puts on changing rooms.

Yes. Plumbing is pre installed and the open layout is fitted out to your brief with showers, toilets, benches and storage, so the building arrives ready to bring into use.

More ways to use a modular home

Explore other uses.

Finance available on every building, from £160 a month. Spread the cost and let the bookings pay it back. See finance options

Free download

Get the PrefabX brochure

Floor plans, pricing, full specifications, and real project photos. Everything you need to start planning your build.

We will email you the brochure. No spam, ever.

PrefabX modular home brochure front cover
Get a Fixed Price Quote Call Us