PrefabX Modular Classroom

A modular classroom ready for the new term.

Warm, bright, insulated teaching space that arrives finished and installs in 2 to 3 days, so a school can add a classroom in the holidays without a building season.

4.9/5 from 336 reviews 01743 491181

Prefer to see one first? Book a show home visit

A modular classroom is a factory built teaching space installed far faster than conventional construction. The PrefabX modular home modular classroom arrives finished, insulated and bright, and is installed in 2 to 3 days, so schools and nurseries can add capacity over a holiday rather than waiting out a build.

A modular classroom is right for you if

  • Your school or nursery needs extra teaching space quickly
  • You want to add a classroom over a holiday, not a build season
  • You need a warm, bright, properly insulated room
  • You want a fixed price and a building you can relocate

Why a PrefabX modular classroom works

Added over a holiday

Manufactured off site and installed in 2 to 3 days, so a new classroom can be ready for the start of term without disrupting the school year.

Warm, bright and quiet

An insulated, sound tested shell with large glazing makes a comfortable, well lit room for learning all year round.

Flexible and relocatable

If rolls change, the classroom can be relocated or repurposed, so it adapts to the school rather than the other way around.

The range

The best modular home for a modular classroom

The Hub gives one open teaching space, and the Grand joins two units for a larger classroom or a room with breakout and storage areas.

Gallery

See the modular classroom in use.

Photo coming soon

Modular Classroom placeholder

Photo coming soon

Modular Classroom placeholder

Photo coming soon

Modular Classroom placeholder

Helen Carter
“We added a classroom over the summer holidays without disrupting the school year. It is warm, bright and the children love it.”

Helen Carter

Headteacher, Nottinghamshire

Walkthrough

Take a closer look.

Video walkthrough coming soon

Modular Classroom placeholder

Common questions

Modular Classroom questions, answered.

A PrefabX modular classroom is installed in 2 to 3 days once the base is prepared, and is built off site beforehand. This makes it practical to add teaching space during a school holiday.

School buildings usually require planning permission, though some have permitted development rights through the relevant education planning rules. We assess the site and support the application, working to the timescales the school needs.

Yes. The modular home uses 85mm integrated insulation and skirting heating, with a sound tested envelope, so the classroom is warm, quiet and comfortable through winter, well above the standard of older temporary classrooms.

Yes. The modular home is designed to be moved, so a classroom can be relocated within a site or to another school if pupil numbers change, protecting the investment.

More ways to use a modular home

Explore other uses.

Finance available on every building, from £160 a month. Spread the cost and let the bookings pay it back. See finance options

Free download

Get the PrefabX brochure

Floor plans, pricing, full specifications, and real project photos. Everything you need to start planning your build.

We will email you the brochure. No spam, ever.

PrefabX modular home brochure front cover
Get a Fixed Price Quote Call Us